get the app get the app       get the app       get the app
For unlined canals, the freeboard is measured from the

1)full supply level to top of the bank

2)top of the bank to bed of the canal

3)full supply level to top of the dowel

4)none of the above


  • : 971
  • : 12
    Previous Next

    full supply level to top of the bank

    Suggest other answer
    Login to Discuss/suggest the answer...

  • Exam: Food Corporation of India (FCI) Junior Engineer Civil and Electrical Exam Morning Shift 2014





    Close(X)
    Subscribe here for free mock test on IAS PCS SSC and other competitive exam. Signup here to get SSC CGL Solution and main exam study material